Weiss Architecture Studio

Quis autem vel eum iure reprehenderit qui in ea voluptate velit esse quam nihil molestiae lorem.

The three-level Izzy North and Izzy South projects are located on both sides of 2100 South at approximately 500 East. The project is scheduled for completion by mid 2023. ajc worked in close collaboration with developer High Boy Ventures, during design, to bring market rate studio apartments and full-sized town houses

Paulsen Construction will finish construction of Station 125 within the next few weeks. This 15,800 square foot prototype UFA Fire Station contains a three lane apparatus bay, lobby, day room and dining area, dorm rooms, full commercial kitchen, exercise room, patio space, decontamination area, laundry room, showers, locker room, gear room,

The flagship facility, a joint venture between Salt Lake Community College and the University of Utah, is slated to open to students in the Fall of 2023. The project includes the construction of an 11,700 square foot central utility plant which will provide electrical distribution, heating, and cooling to future buildings

Sean, an Illinois native, graduated with a degree in architecture from the Savannah College of Art and Design while learning the ropes as an architectural intern for a local firm.         Originally from Saudi Arabia, Rawan joined ajc after graduating from the University of Utah as an accomplished architectural student.           Heather, a designer and artist, is a homegrown Utahn. Heather attended